BAPCO UPSTREAM W.L.L, Bahrain receives the Bidders proposal to install 7 x NAG Compression stations around Bahrain field.
Following Bidders submitted the proposals:
- BEINIT Energy DMCC – BHD 106,520,467.790
- JEREH GROUP MIDDLE EAST DMCC – BHD 119,119,031.680
- Enerflex Middle East W.L.L – BHD 129,059,384.760
- WASCO ENGINEERING INTERNATIONAL LIMITED – BHD 153,666,343.000
- ENGINEERING FOR THE PETROLEUM AND PROCESS INDUSTRIES BRANCH ENPPI KSA – BHD 392,920,042.340
The scope will cover the stations only, the interconnecting pipelines from wells and to the receivers will be handled by another contract – in house. Each station will include the equipment: Feed Gas Air Cooler, Inlet Separator, Suction KOD, Compressor & Engine Driver Unit Skids, Discharge Air Cooler, Closed Drain Vessel, Closed Drain Pumps, PA, IA and N2 Package, Chemical Injection Packages, Flare package etc., associated piping, control valves, shutdown valves, F and G, etc. and required Instrumentation and electrical systems.
***
SaudiGulf Projects – Monthly Updates along with summary of Major Projects awards
Now available in Digital (Pdf) format!
Stay ahead with the latest project news, developments, and insights from across the Gulf.
For more details, please visit: Monthly Reports
