The Renewable Energy Project Development Office (REPDO), Saudi Arabia has extended the bid submission date for Round 3 Solar PV Projects.
For Category A Projects (200MW), the Bid submission date has been extended up to 03 May 2021 from its earlier bid submission date of 06 April 2021.
For Category B Projects (1000MW), the Bid submission date has been extended up to 24 May 2021 from its earlier bid submission date of 02 March 2021.
REPDO Round 3 is comprised of four Solar PV projects with a combined generation capacity of 1,200 megawatts (MW). The projects, which are located on four sites in the central region of the Kingdom, will be as follows:
Category A: Category A will consist of two projects of total Capacity 200MW (read more)
- Layla Solar PV IPP with a capacity of 80 MW to be located in the Aflaj Province, approximately 300 km from Riyadh city
- Wadi Al Dawaser Solar PV IPP with a capacity of 120 MW to be located in the central Province, approximately 600 km from Riyadh city
Category B: Category B will consist of two projects of total Capacity 1000MW (read more)
- Ar Rass Solar PV IPP with a capacity of 700 MW to be located in the central Province, approximately 420 km from Riyadh city
- Saad Solar PV IPP with a capacity of 300 MW to be located in the central Province, approximately 80 km from Riyadh city
REPDO is being advised by Sumitomo Mitsui Banking Corporation (DIFC Branch) – Lead and Financial Adviser, DLA Piper Middle East LLP – Legal Adviser and Fichtner GmbH & Co. KG – Technical Adviser for this project.
All projects tendered by The Ministry of Energy are 100% IPPs backed by 25-year Power Purchase Agreements (PPA) with the Saudi Power Procurement Company (SPPC) as offtaker.
Since its inception, The Ministry of Energy, through the National Renewable Energy Program (NREP), has pre-developed and tendered 2,170 MW of renewable energy capacity in the Kingdom, of which 700 MW was awarded in 2019 and a further 1,470 MW will be awarded soon.
***
***
SaudiGulf Projects – Monthly Updates along with summary of Major Projects awards
Now available in Digital (Pdf) format!
Stay ahead with the latest project news, developments, and insights from across the Gulf.
For more details, please visit: Monthly Reports
