Orascom, Metito Consortium awarded $2.4bn Seawater Treatment Project in UAE

ADNOC and Abu Dhabi National Energy Company PJSC (TAQA) announced the award of a strategic investment project estimated at up to $2.4 billion (AED 8.8 billion) to provide sustainable water supply for ADNOC’s onshore operations, reinforcing ADNOC and TAQA’s position as responsible energy leaders and underscoring their efforts to drive sustainable initiatives that deliver long-term value.

ADNOC and TAQA will jointly hold a 51% majority stake (25.5% each) in the Project Company and the remaining 49% stake has been awarded to a consortium comprised of Orascom Construction and Metito (the “Consortium”).

The Consortium will arrange the project financing for the construction phase and develop the project under a build, own, operate and transfer (BOOT) model, with the full project being returned to ADNOC after 30 years of operation.

The project will develop a centralized world-class seawater treatment facility and transportation network for operations at the Bab and Bu Hasa fields in Abu Dhabi.

This project will replace the current high-salinity, deep aquifer water systems at the fields, thereby reducing water injection related energy consumption by up to 30%. The project will be connected to the grid and will receive 100% of its power from clean energy sources.

The project will deliver more than 110 million imperial gallons per day (MIGD) of nano filtered seawater through 75 kilometers of transportation and over 230 kilometers of distribution pipelines and two pumping stations, supplying sustainable water for ADNOC’s onshore operations.