The General Authority of Civil Aviation in the Syrian Arab Republic signed the final concession contracts related to investment in the development, expansion, construction, and operation of Damascus International Airport with an international consortium led by UCC Holding through its subsidiary Urbacon Concessions Investment, with the participation of Cengiz İnşaat of Turkey, Kalyon İnşaat of Turkey, and Assets Investments of the United States.
The project represents the largest investment in Syria’s history, valued at USD 4 billion, reflecting strong international confidence in the future of Syria’s aviation sector.
Implementation works have also begun on the ground, as the consortium companies commenced the development works of Terminal 2 at the airport, in addition to the rehabilitation of the old hotel building inside the airport premises, and the start of improving the main road leading to the airport, reflecting the consortium’s commitment to implementing the project according to an accelerated timetable consistent with the requirements of rehabilitating the airport and raising its operational readiness.
The project proceeds according to a gradual development plan aimed at increasing the capacity of Damascus International Airport to become a modern and integrated regional hub. The plan begins with the operation of the new passenger terminal, Terminal 2, before the upcoming Hajj season, after completing all operational and logistical preparations, as well as security, navigation, handling, and aircraft fueling systems.
In parallel, Terminal 1 will be redesigned and developed, and its interior and service facilities updated, with work expected to be completed by the end of 2026, which will raise the airport’s capacity to 6 million passengers annually.
In the next phase, the project moves to a larger expansion through developing airside and logistical facilities, aircraft stands, cargo centers, and commercial and service infrastructure, simultaneously with the construction of the new Terminal 3, which will be built according to the highest international standards adopted by the International Civil Aviation Organization (ICAO) and the International Air Transport Association (IATA). The terminal will include advanced operational capabilities, including up to 32 gates equipped with modern boarding bridges, in addition to a world-class duty-free zone containing restaurants, cafés, and international brands.
According to the development schedule, the airport’s capacity will increase to 16 million passengers annually upon completion of the first phase of Terminal 3. The final capacity, upon completion of Terminal 3 and all construction and logistical works, will reach 31 million passengers annually, making it one of the most advanced airports in the region in terms of technology, service quality, and operational efficiency. The airport is being developed based on a world-class architectural design prepared by Zaha Hadid Architects, giving the project a distinctive identity that reflects a forward-looking vision for regional airports. The project also includes a USD 250 million financing program for the purchase of new aircraft in support of Syria’s aviation sector, in addition to adopting the latest operational technologies such as electronic gates (E-Gates), which will accelerate passenger processing and enhance the overall efficiency of airport operations.
The project is expected to provide more than ninety thousand direct and indirect job opportunities across the different stages of construction and operation, including engineering, air operations, ground services, logistics, trade, and hospitality, making it one of the most impactful projects in the Syrian aviation labor market in recent decades. The project, led by UCC Holding, reflects a new phase in managing infrastructure projects in Syria through long-term partnerships that combine international expertise with global standards, restoring Damascus International Airport’s vital position and paving the way for the return of its role in regional and international air transport, statement mentioned.
***
SaudiGulf Projects – October 2025 Updates along with summary of Major Projects awards
Now available in PDF format!
Stay ahead with the latest project news, developments, and insights from across the Gulf.
For more details, please visit: Monthly Reports-October 2025
