Oman invites bids for Dual Carriageway Road of NR 32 Phase 1 at Duqm

Public Authority for Special Economic Zones and Free Zones, Oman invites the bid for Construction of Dual Carriageway Road for NR 32 Phase 1 at Duqm located in Al Wusta Governorate.

The Scope of Works includes:

  • Main Road consists of 03-lanes Dual Carriageways for length of 15.267 Km along with 04-Signalized Intersections, 01-Roundabout and hardscaped Center Median. Main road consists of 03-bridges proposed over natural Wadis Saay (428m), Jurf (581m) and Dangert (120m).
  • On both sides of Main Road, construction of Service Roads approximate length of 22km, fourteen (14) cul-de-sacs, vented floodways, drainage pipes and side walkways with hardscaping.
  • Construction of Link Roads approximate length of 5km for connections with future planning as well as to Duqm Refinery.
  • Ground Improvement Works
  • Construction of Earthen Embankments and Dykes, Sub-grade, Granular Sub Base Course, Aggregate Base Course, Bituminous Base Course, Bituminous Wearing Course, Polymer Modified Bituminous Wearing Course.
  • Construction of Diversion Road approximate length of 4km wherever required during execution.
  • Culverts and drainage catch pits,
  • LED street lighting & Traffic signaled intersections,
  • Landscaping, Irrigation system & Utilities
  • Relocation & protection of existing utilities and other ancillary works

Interested bidders can obtain the complete bid documents upon payment of tender fee OMR 3000.

Bidders need to submit 1% of the tender value towards tender security along with the proposals.

At present bid submission date is 03 August 2021.

Read Also: Oman received the lowest bid of $61 million for Duqm Dual Carriageway Road