Elsewedy Electric awarded Supply of Cables Contract for NEOM’s The Line

Elsewedy Electric KSA announces tha the Company is proud to be part of the NEOM project, providing low-voltage and medium-voltage cables for the two 28km tunnels that make up part of “The Line”.

Set in the Neom Mega City, this 170 km belt will become a massive green space, offering unique hyper-connected communities that are free from cars and roads, which contributes to the reduction of carbon emissions

Neom is a revolutionary city designed to inspire an alternative way of living and respond to some of the most critical global challenges urban areas face. Neom is committed to providing 100% renewable energy, with solar, wind, and hydrogen-based power generation ensuring that the city will be completely carbon neutral, with zero emissions

The Line will be the world’s first zero-gravity vertical city. There will be a hyper rail line running through the city to boost travel and these tunnels will be powered through a renewable-powered electric system making transportation far more efficient and reliable.