SEC issued tender for Construction of 9098 Switching Substation

Saudi Electricity Company (SEC) issued tender for the construction of 380kV Switching Substation, 9098. The Projects locations is in Riyadh.

Project involves the construction a new indoor 380kV Gas Insulated Substation. It includes protection, control, communication and SAS/SCADA systems. Major equipment of the Substation consist of following major equipment:
  • 380kV Gas Insulated Switchgear (GIS)
  • 380kV Hybrid GIS
  • 13.8kV Switchgear
  • 2.5MVA, 13.8kV/400V-230V Station Service Transformers
  • 380kV, 100MVAR Reactors
  • HV/MV Power Cables and Terminations,
  • AC/DC Auxiliary Power Supply,
  • Outdoor Switching equipment
  • Control/Protection System,
  • Substation Automation System (SAS)
  • Communication System
  • Fire Detection/Alarm and Safety and Fire Protection System
  • Civil/Structural works and Mechanical works
  • HCIS Security System

Project scope of work also includes the expansion of 9053 BSP by providing 380kV Hybrid GIS, 380kV-100MVAR Reactors and associated modifications.

The Contractor shall perform on Lump sum turnkey basis, the design, engineering, materials procurement, quality management, factory inspection/testing, transport and delivery to site, installation, construction, site inspection, testing and commissioning, all associated work and services until final handing over of new substation work in a satisfactorily working and operating condition.

Contractor needs to achieve the final acceptance of the works by 27 months from Contract Signing Date.

At present bid submission date is 04 February 2021.

Read Also:

SEC issued tender for Construction of 380kV Switching Substation – 9097

SEC issued tender for King Salman Park 380/132/13.8kV Substation

***

For latest updates, follow us on  LinkedInFacebookTwitter, Instagram , PinterestYouTubeTumblr, Google News

1 Trackback / Pingback

  1. TDP Company submits lowest bid of $129.4m for 380kV Cable project

Comments are closed.